How to make papier-mâché look like concrete
How to get a concrete finish on papier-mâché: about 1.4 h of work, ≈ $18–43 in finish materials. Prep, steps and numbers for 3 projects.
The concrete finish is painted on once the papier-mâché (also spelled paper mache) is dry, about 1–3 days after the last coat. Before it: sand (30 min). We calculate it on 3 papier-mâché projects — wall pockets, vases and planters. The finish itself takes about 1.4 h of work and 7–14 h of drying between coats; finish materials cost ≈ $18–43 for any of them.
Concrete: Grey, matte, with tiny pores.
- Difficulty
- Easy
- Finish time
- 1.4 h work + 7–14 h drying
- Finish materials
- ≈ $18–43
- When
- painted on after drying
- Water
- Fears water
- Outdoors
- indoors only
Concrete on papier-mâché: time and cost by project
Each one at its standard size, with this finish applied. Finish materials are rough ranges per pack.
papier-mâché wall pocket
1.4 h of finish work
papier-mâché vase
1.4 h of finish work
papier-mâché planter
1.4 h of finish work
| Project | Finish work | Between coats | Finish materials | Whole project |
|---|---|---|---|---|
| papier-mâché wall pocket | 1.4 h | 7–14 h | ≈ $18–43 | 5.8 h work + 1–4 days drying |
| papier-mâché vase | 1.4 h | 7–14 h | ≈ $18–43 | 5.6 h work + 1–4 days drying |
| papier-mâché planter | 1.4 h | 7–14 h | ≈ $18–43 | 5.3 h work + 1–4 days drying |
Before the finish: preparing papier-mâché
- Let the papier-mâché dry — 1–3 days after the last coat.
- Sand — about 30 min.
You’ll need
- Texture paste — about 500 per m² of surface
- Grey acrylic paint — about 200 per m² of surface
- Matte varnish — about 80 per m² of surface (optional)
- brushes
- sponge
The concrete recipe over papier-mâché
- 1
Prime
15 min workthen wait 1–2 h
- 2
Texture
30 min workthen wait 3–6 h
- 3
Colour
30 min workthen wait 1–2 h
- 4
Seal
10 min workthen wait 2–4 h
- 1. Prime
Paint one coat of white acrylic as an even base.
15 min workthen wait 1–2 h
- 2. Texture
Dab texture paste with a sponge for a pitted surface; let it dry.
30 min workthen wait 3–6 h
- 3. Colour
Two thin coats of grey acrylic, then wipe a darker grey into the pores.
30 min workthen wait 1–2 h
- 4. Seal
One coat of matte varnish.
10 min workthen wait 2–4 h
Questions about concrete on papier-mâché
Can you put a concrete finish on papier-mâché?
Yes — it is painted on once the papier-mâché is dry. We calculate it on 3 papier-mâché projects: wall pockets, vases and planters.
How long does a concrete finish take on papier-mâché?
The finish takes about 1.4 h of work, plus 7–14 h of drying between coats. The whole project, start to finish, is from 5.3 h (planter) to 5.8 h (wall pocket) of hands-on work.
How much does a concrete finish cost on papier-mâché?
≈ $18–43 in finish materials — the same packs cover any of the 3 projects. Prices are rough ranges per pack.
How do I prepare papier-mâché for a concrete finish?
Let it dry 1–3 days after the last coat. Then: sand (30 min).
Is concrete papier-mâché waterproof?
Papier-mâché: fears water.
Can a concrete papier-mâché piece go outside?
No. Outdoors only concrete-type materials survive: microcement as a coating, concrete or acrylic plaster for a cast. Cardboard rots outdoors: use foam or a jar as the core.