How to make acrylic plaster look like raw concrete
How to get a raw concrete look in cast acrylic plaster: about 5 min of work, ≈ $10–25 in finish materials. Prep, steps and numbers for 4 projects.
The raw concrete look goes into the acrylic plaster (the material of Jesmonite-type casting kits) as you cast it. We calculate it on 4 acrylic plaster projects — vases, coasters, trays and planters. The finish itself takes about 5 min of work; finish materials cost ≈ $10–25 for any of them.
Raw concrete: Natural grey cast with open pores, no paint.
- Difficulty
- Very easy
- Finish time
- 5 min work
- Finish materials
- ≈ $10–25
- When
- while casting
- Water
- See the manufacturer’s card
- Outdoors
- yes
Raw concrete on acrylic plaster: time and cost by project
Each one at its standard size, with this finish applied. Finish materials are rough ranges per pack.
acrylic plaster vase
5 min of finish work
acrylic plaster coaster
5 min of finish work
acrylic plaster tray
5 min of finish work
acrylic plaster planter
5 min of finish work
| Project | Finish work | Between coats | Finish materials | Whole project |
|---|---|---|---|---|
| acrylic plaster vase | 5 min | — | ≈ $10–25 | 1 h work + 1–2 days drying |
| acrylic plaster coaster | 5 min | — | ≈ $10–25 | 1 h work + 1–2 days drying |
| acrylic plaster tray | 5 min | — | ≈ $10–25 | 1 h work + 1–2 days drying |
| acrylic plaster planter | 5 min | — | ≈ $10–25 | 1 h work + 1–2 days drying |
You’ll need
- Matte stone sealer — about 100 per m² of surface (optional)
- stiff brush
In the acrylic plaster mix
- 1. Keep the pores
Tap the mould for only a few seconds so some small bubbles stay as pores; add no pigment, so the material keeps its own colour.
5 min work
Safety with acrylic plaster
- Wear a dust mask when sanding.
Questions about raw concrete on acrylic plaster
Can you cast acrylic plaster with a raw concrete look?
Yes — it goes into the mix while you cast. We calculate it on 4 acrylic plaster projects: vases, coasters, trays and planters.
How long does a raw concrete finish take on acrylic plaster?
The finish takes about 5 min of work. The whole project, start to finish, is about 1 h of hands-on work.
How much does a raw concrete finish cost on acrylic plaster?
≈ $10–25 in finish materials — the same packs cover any of the 4 projects. Prices are rough ranges per pack.
Is raw concrete acrylic plaster waterproof?
Acrylic plaster: see the manufacturer’s card.
Can a raw concrete acrylic plaster piece go outside?
Yes, it holds up outdoors. Outdoors, seal acrylic plaster with two coats of a breathable stone sealer and bring it in before frost.