Ditto Made

How to make plaster cloth look like travertine

How to get a travertine finish on plaster cloth: about 1.5 h of work, ≈ $18–43 in finish materials. Prep, steps and numbers for 3 projects.

The travertine finish is painted on once the plaster cloth (also called plaster bandages or Mod-Roc) is dry, about 12–24 h after the last coat. Before it: sand (30 min). We calculate it on 3 plaster cloth projects — wall pockets, vases and planters. The finish itself takes about 1.5 h of work and 7–14 h of drying between coats; finish materials cost ≈ $18–43 for any of them.

Travertine: Warm beige stone with soft bands and holes.

See it in your room

Scan with your phone camera, then tap “View in your room”. It shows this shape at its real size through the camera — free, nothing to install.

Works on recent iPhones and iPads in Safari, and on Android phones with Google Play Services for AR in Chrome.

Difficulty
Medium
Finish time
1.5 h work + 7–14 h drying
Finish materials
≈ $18–43
When
painted on after drying
Water
Fears water
Outdoors
indoors only

Travertine on plaster cloth: time and cost by project

Each one at its standard size, with this finish applied. Finish materials are rough ranges per pack.

ProjectFinish workBetween coatsFinish materialsWhole project
plaster cloth wall pocket1.5 h7–14 h≈ $18–434 h work + 1–2 days drying
plaster cloth vase1.5 h7–14 h≈ $18–434.2 h work + 1–2 days drying
plaster cloth planter1.5 h7–14 h≈ $18–434.2 h work + 1–2 days drying

Before the finish: preparing plaster cloth

  1. Let the plaster cloth dry — 12–24 h after the last coat.
  2. Sand — about 30 min.

You’ll need

The travertine recipe over plaster cloth

  1. 1

    Base

    20 min workthen wait 1–2 h

  2. 2

    Bands

    30 min workthen wait 1–2 h

  3. 3

    Holes

    30 min workthen wait 3–6 h

  4. 4

    Seal

    10 min workthen wait 2–4 h

1.5 h of hands-on work 7–14 h of waiting
  1. 1. Base

    Paint a warm beige base.

    20 min workthen wait 1–2 h

  2. 2. Bands

    Drag a damp brush sideways through thin brown glaze to make soft bands.

    30 min workthen wait 1–2 h

  3. 3. Holes

    Press a stiff brush into fresh texture paste for small holes, then wipe the top.

    30 min workthen wait 3–6 h

  4. 4. Seal

    One coat of matte varnish.

    10 min workthen wait 2–4 h

Questions about travertine on plaster cloth

Can you put a travertine finish on plaster cloth?

Yes — it is painted on once the plaster cloth is dry. We calculate it on 3 plaster cloth projects: wall pockets, vases and planters.

How long does a travertine finish take on plaster cloth?

The finish takes about 1.5 h of work, plus 7–14 h of drying between coats. The whole project, start to finish, is from 4 h (wall pocket) to 4.2 h (planter) of hands-on work.

How much does a travertine finish cost on plaster cloth?

≈ $18–43 in finish materials — the same packs cover any of the 3 projects. Prices are rough ranges per pack.

How do I prepare plaster cloth for a travertine finish?

Let it dry 12–24 h after the last coat. Then: sand (30 min).

Is travertine plaster cloth waterproof?

Plaster cloth: fears water.

Can a travertine plaster cloth piece go outside?

No. Outdoors only concrete-type materials survive: microcement as a coating, concrete or acrylic plaster for a cast. Cardboard rots outdoors: use foam or a jar as the core.

Pick a shape to makeTravertine: the full recipePlaster bandages: properties and safety