Tulip vase in air-dry clay with a concrete look
Air-dry clay slab with darts
- Difficulty
- Medium
- Time
- 4 h work + 3–6 days drying
- Weight
- about 880 g
- Materials
- ≈ $33–77
- Size
- Ø 14 cm × 22 cm
- Where
- Indoors
Safety
- Air-dry clay is decorative only: it doesn’t hold water and isn’t food-safe, even varnished.
- Over a rigid core (jar, foam) keep it thin: thick layers crack — or use paper clay.
- Shrinkage: check the manufacturer’s card or make a test strip.
- Dry clay dust: sand it damp or outdoors, and wear a mask.
- Templates are 3.6 % larger for the clay’s usual shrinkage — check your clay’s pack or make a test strip.
Shopping list
Amounts include a 15 % reserve. Prices are rough ranges for one pack.
🛒 To buy · ≈ $33–77
- Air-dry clay — 1.2 kg2 × 1 kg pack · ≈ $12–28
- Sandpaper 180–240 — 2 pcspack of 3 sheets · ≈ $3–6
- Texture paste — 52 g500 g tub · ≈ $8–15
- Acrylic paint — 21 ml120 ml bottle · ≈ $4–14
- Matte varnish — 8 ml250 ml can · ≈ $6–14
Files to print
2 A4 pages: a cover with the control square, then the parts at 1:1 (Paper templates for the clay slab).
The print-ready PDF and SVG files come with your own project.
Finish: Concrete
The recipe steps are in the “Finish” stage below.
Steps
Try the tracker: ticks and timers here aren’t saved.
Prepare
1. Print and check the pattern
Print the 2 A4 pattern sheets at 100 % (“actual size”, no scaling) and measure the control square on the cover: it must be exactly 10 × 10 cm. The pieces are already 3.6 % larger for shrinkage.
10 min work
2. Cut paper templates
Cut out the paper templates. Rub a little oil on the back or use baking paper so they don’t stick to the clay.
15 min work
3. Roll the slab
Wedge 1.1 kg of air-dry clay, then roll it on canvas between two 6 mm guide sticks, turning it and rolling in several directions so it shrinks evenly.
25 min work
4. Let it firm up
Leave the slab uncovered until it holds its shape when you lift a corner but still bends without cracking.
then wait 0.5–2 h
Ready when: Soft leather-hard: bends without cracks.
Frame
5. Cut the wedges
Lay the template on the slab and cut 8 wedges and the base with a needle tool.
25 min work
6. Build the wall
Score and slip the long edges (cut the edges at 45° so they meet flush) and join the wedges one by one around the base, bending each to the curve.
40 min work
7. Smooth the seams
Smooth every seam inside and out with a rib and a damp sponge.
20 min work
Drying
8. Dry slowly
Cover loosely with a plastic bag for the first day so it dries evenly, then uncover and let it dry right through. Turn it now and then.
then wait 3–5 days
Ready when: Light in colour all over and no longer cool to the touch.
Sanding
9. Smooth
Wipe the seams with a barely damp sponge, then sand lightly with 220 grit, outdoors or with a mask.
20 min work
Finish
10. Prime
Paint one coat of white acrylic as an even base.
15 min work · then wait 1–2 h
11. Texture
Dab texture paste with a sponge for a pitted surface; let it dry.
30 min work · then wait 3–6 h
12. Colour
Two thin coats of grey acrylic, then wipe a darker grey into the pores.
30 min work · then wait 1–2 h
13. Seal
One coat of matte varnish.
10 min work · then wait 2–4 h